SECTION 7.0, INSTALLATION
7.0 INSTALLATION
The installation overview of the Ultraflow 150 system is shown in
Drawings ULTRAFLOW 150 FLANGE INSTALLATION, and ULTRA
FLOW 150 SYSTEM INSTALLATION. It is important that the
centerline of the two transducers be maintained so that the installed
transducers can be pointed directly at each other.
7.1 PRE-INSTALLATION PLANNING AND PREPARATION
The engineering that precedes installation of the Ultraflow 150 is vital to
successful operation of the instrument and must be performed in
consultation with responsible Teledyne Monitor Labs representatives.
Key factors that must be considered include:
Location of the Purge Nozzle and Mounting Plate Assembly, and
Transducer Interface Enclosure (TIE). Items such as vibration, heat
range, stream turbulence, installation and maintenance access, and
protection from environmental and mechanical hazards must be
considered.
Proper installation and location of the Purge Assembly (as per installation
drawing).
Electrical power source, cable and conduit runs, overload protection, and
provisions for safety disconnect.
Signal cable run (distance, routing, and proximity to other electrical
equipment).
Location of the Enhanced Remote Panel. Auxiliary circuits such as
alarms, auxiliary indicator/displays, etc., must be considered.
An installation packet containing a number of Teledyne Monitor Labs
drawings and a document titled, "Ultraflow 150 Installation Guide &
Checklist", is provided to the user soon after the purchase order for the
equipment is received by Teledyne Monitor Labs. The mounting plates,
which are supplied by Teledyne Monitor Labs as part of the system, may
be shipped at the same time if requested by the customer. The installation
checklist contains a number of questions that must be answered by the
user before assembly and calibration of the system may begin at the
Teledyne Monitor Labs factory.
7-1
Summary of Contents for ULTRAFLOW 150
Page 2: ...DOCUMENT NO 1900 0100 01 REV E ...
Page 24: ...ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR This page intentionally left blank 4 6 ...
Page 75: ...SECTION 7 0 INSTALLATION This page intentionally left blank 7 7 ...
Page 76: ......
Page 85: ...SECTION 8 0 SYSTEM CALIBRATION AND ADJUSTMENT This page intentionally left blank 8 9 ...
Page 86: ......
Page 89: ...APPENDIX A SITE SPECIFICATION DATA SHEETS ...
Page 90: ...ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR This page intentionally left blank ...
Page 95: ...APPENDIX B MAINTENANCE CHECK SHEETS ...
Page 96: ... This page intentionally left blank ...
Page 101: ...APPENDIX C SPARE PARTS ...
Page 102: ... This page intentionally left blank ...
Page 105: ......
Page 106: ...APPENDIX D DRAWINGS ...
Page 107: ... This page intentionally left blank ...
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ...APPENDIX E ENHANCED SERIAL PORT COMMUNICATION PROTOCOL ...