SECTION 4.0, Theory of operation
4.0 THEORY OF OPERATION
4.1 PHYSICS OF MEASUREMENT
4.1.1 Time of Flight Theory
The Ultraflow 150 system measures the transit times of ultrasonic tone bursts
through the gas stream to determine flow velocity, temperature, and volume.
Each effluent path monitored by the Transducer Interface Enclosure (TIE) uses
two transducers placed on opposite sides of the stack or duct (see Ultraflow 150
System Installation Drawing, Appendix D). The transducers are pointed at each
other with one transducer located diagonally upstream from the other. Each
transducer acts alternately as a transmitter or receiver with the ultrasonic waves
passing through the centroid of the stack or duct to the other transducer. This
makes the measurements a line average of the tone burst path length. When a
tone burst is sent through the gas stream from the upstream transducer to the
downstream transducer the movement of the gas stream reduces the time required
to traverse the distance. When the tone burst is traveling against the gas stream
from the downstream to the upstream transducer, the traverse time is increased.
When there is no gas flow, the time required for the ultrasonic tone bursts to
traverse the gas stream in either direction is the same. Both the upstream and
downstream transit times are measured by the Transducer Interface Enclosure to
an accuracy of 0.5 microseconds.
Figure 4-1
Transit Time Theory
Upstream
Transducer
L
θ
(Actual)
Fv
(Nominal)
Fv
Ft
Downstream
Transducer
4-1
Summary of Contents for ULTRAFLOW 150
Page 2: ...DOCUMENT NO 1900 0100 01 REV E ...
Page 24: ...ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR This page intentionally left blank 4 6 ...
Page 75: ...SECTION 7 0 INSTALLATION This page intentionally left blank 7 7 ...
Page 76: ......
Page 85: ...SECTION 8 0 SYSTEM CALIBRATION AND ADJUSTMENT This page intentionally left blank 8 9 ...
Page 86: ......
Page 89: ...APPENDIX A SITE SPECIFICATION DATA SHEETS ...
Page 90: ...ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR This page intentionally left blank ...
Page 95: ...APPENDIX B MAINTENANCE CHECK SHEETS ...
Page 96: ... This page intentionally left blank ...
Page 101: ...APPENDIX C SPARE PARTS ...
Page 102: ... This page intentionally left blank ...
Page 105: ......
Page 106: ...APPENDIX D DRAWINGS ...
Page 107: ... This page intentionally left blank ...
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ...APPENDIX E ENHANCED SERIAL PORT COMMUNICATION PROTOCOL ...