
SECTION 6.0, ENHANCED REMOTE PANEL W/MULTI I/O MODULE
6.3.2.9 Multi I/O Board (Hardware)
The Multi I/O Board is a peripheral hardware interface. It communicates with the
other devices in the system via a network interface. It gathers information from
the TIE(s) and the Enhanced Remote Display via the network. It processes this
information together with its digital inputs and site specific configuration to
control its outputs.
The Multi I/O is capable of driving eight digital outputs (dry relay contacts) and
four analog outputs. It can read up to eight digital inputs. The digital inputs are
jumper configurable to be either dry contacts or 0 – 5 VDC signals. Dry contacts
are standard.
The analog outputs are jumper configurable to be 4 – 20 mA, 0 – 20 mA, or 0 –
24 mA current loop signals. (0 – 20 mA) is the standard jumper setting, though
the standard current output range is 4mA to 20mA. The standard jumper setting
allows values less than 4mA to be transferred to a data collection device. This
allows the 4mA level to function as a “live zero”. Test points are provided for
measuring output current. See Jumper and Test Point Tables 6-4A and 6-4B.
6-7
Summary of Contents for ULTRAFLOW 150
Page 2: ...DOCUMENT NO 1900 0100 01 REV E ...
Page 24: ...ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR This page intentionally left blank 4 6 ...
Page 75: ...SECTION 7 0 INSTALLATION This page intentionally left blank 7 7 ...
Page 76: ......
Page 85: ...SECTION 8 0 SYSTEM CALIBRATION AND ADJUSTMENT This page intentionally left blank 8 9 ...
Page 86: ......
Page 89: ...APPENDIX A SITE SPECIFICATION DATA SHEETS ...
Page 90: ...ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR This page intentionally left blank ...
Page 95: ...APPENDIX B MAINTENANCE CHECK SHEETS ...
Page 96: ... This page intentionally left blank ...
Page 101: ...APPENDIX C SPARE PARTS ...
Page 102: ... This page intentionally left blank ...
Page 105: ......
Page 106: ...APPENDIX D DRAWINGS ...
Page 107: ... This page intentionally left blank ...
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ...APPENDIX E ENHANCED SERIAL PORT COMMUNICATION PROTOCOL ...