
ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR
INITIATION AND CONTROL OF CALIBRATIONS AND MODES OF OPERATION
The system calibration may be initiated and controlled from the serial port. TIE1 and TIE2 may
be controlled independently when both are present. The following command string may be used.
The command string for TIE1 is as follows: 998, "command", 998, "command" <CR> <LF>
The command string for TIE2 is as follows: 999, "command", 999, "command" <CR> <LF>
The value for "command" is chosen from the following list of commands.
Command Number Action resulting from specified Command Number
1
NORMAL
2
SPANHIGH
3
SPANLOW
4
ZERO
5
DIAGNOSTIC (this command should not be used)
6
TEST_FULL_SCALE (for MIO 4 to 20 mA outputs)
7
TEST_MID_SCALE (for MIO 4 to 20 mA outputs)
8
TEST_ZERO_SCALE (for MIO 4 to 20 mA outputs)
9
CAL_CYCLE (the TIE will complete a full calibration
cycle typically consisting of both Zero and Span High
modes and then returning to Normal operation.
10
PUT_OUT_OF_SERVICE (may be used to indicate
when maintenance is done on the monitor)
11
PUT_IN_SERVICE (may be used to indicate when the
monitor is finished having maintenance done on it)
12
RESET (sends a command to reset the TIE)
13
RECONFIG (sends a command to reconfigure the FPGA)
•
MIO stands for the printed circuit board (Multi Input Output) commonly used to interface with computers
via isolator inputs, relay outputs and analog outputs)
•
TIE stands for the Transducer Interface Enclosure where the electronics which makes the measurement is
located.
•
FPGA stands for Field Programmable Gate Array which is an I.C. within the TIE.
For example to request the TIE1 to go into the SPANHIGH mode the following command line
would be used.
998, 2, 998, 2 <CR> <LF>
If the following command line is given to the ENHANCED REMOTE PANEL, it will list the
commands available for the calibration input command line as shown in the above table.
997 ? <CR> <LF>
E-4
Summary of Contents for ULTRAFLOW 150
Page 2: ...DOCUMENT NO 1900 0100 01 REV E ...
Page 24: ...ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR This page intentionally left blank 4 6 ...
Page 75: ...SECTION 7 0 INSTALLATION This page intentionally left blank 7 7 ...
Page 76: ......
Page 85: ...SECTION 8 0 SYSTEM CALIBRATION AND ADJUSTMENT This page intentionally left blank 8 9 ...
Page 86: ......
Page 89: ...APPENDIX A SITE SPECIFICATION DATA SHEETS ...
Page 90: ...ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR This page intentionally left blank ...
Page 95: ...APPENDIX B MAINTENANCE CHECK SHEETS ...
Page 96: ... This page intentionally left blank ...
Page 101: ...APPENDIX C SPARE PARTS ...
Page 102: ... This page intentionally left blank ...
Page 105: ......
Page 106: ...APPENDIX D DRAWINGS ...
Page 107: ... This page intentionally left blank ...
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ...APPENDIX E ENHANCED SERIAL PORT COMMUNICATION PROTOCOL ...