
ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR
Table 6-3A
Enhanced Remote Display Mother Board Jumper Definitions
Jumper #
Selections
Functional Description
JU1
IRQ1 IRQ2 IRQ3 IRQ4
IRQ5
IRQ6 Out Selects IRQ for reset signal
JU2
IRQ1 IRQ2 IRQ3 IRQ4 IRQ5
IRQ6
Out
RS422/485 Receive IRQ
JU3
UART
TPU
Selects where to send received data
JU4
UART
TPU
Selects UART or TPU data for transmit to J
6
JU5
UART
TPU
422
Selects handshake signal or full time on
JU6
A – B
=
single
B – C =
double
Selects single or double termination of network
JU7
A – B
= terminated
B – C = not terminated Selects if network is terminated at remote or not
JU8
-20V
-24V
Selects drive voltage for LCD contrast adjustment
Table 6-3B
68332 Processor, SBC332 Board, Jumper Definitions
Jumper #
Selections
Functional Description
J2A
1 -- 2
2 – 3
J2A, through J2F configure the Computer Module Board
for the type of memory used. Standard settings are
highlighted.
J2B
1 -- 2
2 – 3
J2C
1 -- 2
2 – 3
J2D
1 -- 2
2 – 3
J2E
1 -- 2
2 – 3
J2F
1 -- 2
2 – 3
J3
1 -- 2 = Enabled
2 -- 3 = Disabled
J3 enables or disables the 68332’s watchdog timer
J9
1 -- 2
2 -- 3
1-2 = 1200
ms
timeout J9 selects the length of time the watchdog timer waits
J7
IN
Out
J7 puts in or takes out the RAM supercap for backup
J10
IN
Out
Selects the serial port outputs of the 68332
J12
IN
Out
Selects the serial port outputs of the 68332
NOTES:
1. J1, J4, J5A, J5B, J6, and J11 on the Computer Module Board are actually connectors.
NEVER jumper together any of the pins on these headers.
2. Bold print or shading indicates the standard selection.
6-6
Summary of Contents for ULTRAFLOW 150
Page 2: ...DOCUMENT NO 1900 0100 01 REV E ...
Page 24: ...ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR This page intentionally left blank 4 6 ...
Page 75: ...SECTION 7 0 INSTALLATION This page intentionally left blank 7 7 ...
Page 76: ......
Page 85: ...SECTION 8 0 SYSTEM CALIBRATION AND ADJUSTMENT This page intentionally left blank 8 9 ...
Page 86: ......
Page 89: ...APPENDIX A SITE SPECIFICATION DATA SHEETS ...
Page 90: ...ULTRAFLOW 150 GAS FLOW AND TEMPERATURE MONITOR This page intentionally left blank ...
Page 95: ...APPENDIX B MAINTENANCE CHECK SHEETS ...
Page 96: ... This page intentionally left blank ...
Page 101: ...APPENDIX C SPARE PARTS ...
Page 102: ... This page intentionally left blank ...
Page 105: ......
Page 106: ...APPENDIX D DRAWINGS ...
Page 107: ... This page intentionally left blank ...
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ...APPENDIX E ENHANCED SERIAL PORT COMMUNICATION PROTOCOL ...