
Teledyne API
– T200 NO/NO
2
/NO
X
Analyzer Operation Manual
Instrument Maintenance
223
11.3.10. REPLACING CRITICAL FLOW ORIFICES
There are several critical flow orifices installed in the T200 (see Figure 13-7 for a
pneumatic location of each orifice). Despite the fact that these flow restrictors are
protected by sintered stainless steel filters, they can, on occasion, clog up, particularly if
the instrument is operated without sample filter or in an environment with very fine,
sub-micron particle-size dust.
Figure 11-7:
Critical Flow Orifice Assembly
To clean or replace a critical flow orifice:
1. Turn off power to the instrument and vacuum pump.
2. Remove the analyzer cover and locate the reaction cell (Figure 11-5 and Figure
3. Unscrew the 1/8” sample and ozone air tubes from the reaction cell.
4. For orifices on the reaction cell (Figure 11-6): Unscrew the orifice holder with a
9/16” wrench.
This part holds all components of the critical flow assembly as shown in Figure
Appendix B contains a list of spare part numbers.
5. For orifices in the vacuum manifold: the assembly is similar to the one shown in
Figure 11-7, except:
Without the orifice holder, P/N 04090, and bottom O-ring, P/N OR34 and;
With an NPT fitting in place of the FT 10 fitting.
6. After taking off the connecting tube, unscrew the NPT fitting.
06858E DCN7057
Summary of Contents for T200
Page 2: ......
Page 4: ...ii This page intentionally left blank 06858E DCN7057 ...
Page 8: ...vi This page intentionally left blank 06858E DCN7057 ...
Page 380: ...This page intentionally left blank B 2 06858E DCN7057 ...
Page 384: ...This page intentionally left blank B 6 06858E DCN7057 ...
Page 387: ...APPENDIX D Wire List and Electronic Schematics 06858E DCN7057 D 1 ...
Page 388: ...This page intentionally left blank D 2 06858E DCN7057 ...
Page 393: ...06858E DCN7057 D 7 ...