
Instrument Maintenance
Teledyne API
– T200 NO/NO
2
/NO
X
Analyzer Operation Manual
208
Table 11-1: T200 Maintenance Schedule
ITEM
ACTION
FREQ
CAL
CHECK
REQ’D
DATE PERFORMED
TEST
functions
Review and
evaluate
Weekly
No
Particulate
filter
Change
particle filter
Weekly (if in
stack system:
As Needed)
No
Zero/span
check
Evaluate
offset and
slope
Weekly
No
Zero/span
calibration
Zero and
span
calibration
Every 3 months
Yes
External zero
air scrubber
option
Exchange
chemical
Every 3 months
No
External
dryer option
Replace
chemical
When indicator
color changes
No
Ozone
cleanser
Change
chemical
Annually
Yes
Reaction cell
window
(“optical
filter” in
Clean
Annually or as
necessary
Yes
DFU filters
Change
particle filter
Annually
No
Pneumatic
sub-system
Check for
leaks in gas
flow paths
Annually or
after repairs
involving
pneumatics
Yes if a
leak is
repaired
Reaction cell
O-rings &
sintered
filters
Replace
Annually
Yes
PMT Sensor
Hardware
Calibration
Low-level
hardware
calibration
On PMT/
preamp
changes or if
slope is outside
of 1.0±0.3
Yes
Pump
Rebuild head
when RCEL
pressure
exceeds 10 in-
Hg-A (at sea
level)
Yes
Inline
Exhaust
Scrubber
Replace
Annually
No
NO
2
converter
Replace
converter
Every 3 years
or if conversion
efficiency drops
below 96%
Yes
Desiccant
bags
Replace
Any time PMT
housing is
opened for
maintenance
n/a
06858E DCN7057
Summary of Contents for T200
Page 2: ......
Page 4: ...ii This page intentionally left blank 06858E DCN7057 ...
Page 8: ...vi This page intentionally left blank 06858E DCN7057 ...
Page 380: ...This page intentionally left blank B 2 06858E DCN7057 ...
Page 384: ...This page intentionally left blank B 6 06858E DCN7057 ...
Page 387: ...APPENDIX D Wire List and Electronic Schematics 06858E DCN7057 D 1 ...
Page 388: ...This page intentionally left blank D 2 06858E DCN7057 ...
Page 393: ...06858E DCN7057 D 7 ...