INSTRUCTION MANUAL
60
7. OPERATION OF THE S-80 MACHINE
Ordinary startup when machine has been shut down:
• Power on.
• Check all machine surroundings visually for breaks, leaks and objects on the way of the
machine (for example the maintenance platform).
• Close all doors (Check that there are no personnel inside the safety area).
• Check warnings and alarms from the Operation panel.
• Push green button to switch control on.
• Switch on AUTO from key switch.
• Before starting to work, do a homing run for the whole machine to check all axis
movements.
7.1. MACHINE GENERAL SETUP
Check the following parameters before beginning to place or remove the
collaring tool, or starting to make a collar
1. Tube diameter
2. Tube wall thickness
3. Collar diameter
4. Tool number of the tool that will be used, the tool parameters have to be correct for
this certain tool as well.
7.1.1. COLLARING TOOL SETUP
When the collaring tool is replaced, the new or renewed tool has to be measured
and a setup must be done to the program.
2
1
4
3
Measure: 1. Tool length from zero surface to cone top (2) (remove nut and washer to ease
measuring) and to tool core end (1). Tool head width with pins fully extended (3) and pins
retracted (4).