Operation
4
Decommissioning
– Lubricate the catch rail of the hydraulic
battery carrier (variant); see the section
entitled "Oiling the catch rails" in the chapter
entitled "1000-hour maintenance/annual
maintenance".
– Check the battery condition, acid level and
acid density.
– Check the hydraulic oil for condensation
water. Change the hydraulic oil if neces-
sary.
– Carry out the checks and tasks that are to be
performed before the first commissioning.
– Perform "visual inspections and function
checking".
The following points must be checked in
particular:
• Drive, control, steering
• Brakes (service brake, parking brake)
• Lifting system (lifting accessories, load
chains, mounting)
NOTE
For further information, see the workshop
manual for the truck or contact the authorised
service centre.
56338011803 EN - 02/2019 - 09
369
www.
duma
-rent.com
Summary of Contents for RX60-25
Page 2: ...www duma rent com ...
Page 4: ...www duma rent com ...
Page 14: ...www duma rent com ...
Page 15: ...1 Foreword www duma rent com ...
Page 38: ...1 Foreword Environmental considerations 24 56338011803 EN 02 2019 09 www duma rent com ...
Page 39: ...2 Safety www duma rent com ...
Page 71: ...3 Overviews www duma rent com ...
Page 73: ...Overviews 3 General view 56338011803 EN 02 2019 09 59 www duma rent com ...
Page 87: ...4 Operation www duma rent com ...
Page 384: ...4 Operation Decommissioning 370 56338011803 EN 02 2019 09 www duma rent com ...
Page 385: ...5 Maintenance www duma rent com ...
Page 392: ...5 Maintenance General maintenance information 378 56338011803 EN 02 2019 09 www duma rent com ...
Page 396: ...5 Maintenance General maintenance information 382 56338011803 EN 02 2019 09 www duma rent com ...
Page 433: ...6 Technical data www duma rent com ...
Page 458: ...6 Technical data Fuse assignment 444 56338011803 EN 02 2019 09 www duma rent com ...
Page 469: ...www duma rent com ...
Page 470: ...STILL GmbH 56338011803 EN 02 2019 09 www duma rent com ...