4
Operation
Decommissioning
– Apply a suitable contact spray to all exposed
electrical contacts.
CAUTION
Tyre deformation as a result of continuous loading
on one side!
Have the truck raised and jacked up by the autho-
rised service centre so that all wheels are off the
ground. This prevents permanent deformation of
the tyres.
– Only have the truck raised and jacked up by the
authorised service centre.
CAUTION
Risk of damage from corrosion due to condensation
on the truck!
Many plastic films and synthetic materials are
watertight. Condensation water on the truck cannot
escape through these covers.
– Do not use plastic film as this facilitates the
formation of condensation water.
– Cover with vapour-permeable material, e.g.
cotton.
– Cover the truck to protect it from dust.
– If the truck is to be shut down for even
longer periods, contact the authorised
service centre to find out about additional
measures.
Returning to service after decommis-
sioning
If the truck has been decommissioned for
longer than six months, it must be carefully
checked before being re-commissioned. As
with the annual safety inspection, this check
should also include all safety-related aspects
of the truck.
– Clean the truck thoroughly, see the chapter
entitled "Cleaning the truck".
– Lubricate the joints and controls.
– Lubricate the slide elements and guides of
the hydraulic battery carrier (variant); see
the section entitled "Lubricating the slide
elements" in the chapter entitled "1000-hour
maintenance/annual maintenance".
368
56338011803 EN - 02/2019 - 09
www.
duma
-rent.com
Summary of Contents for RX60-25
Page 2: ...www duma rent com ...
Page 4: ...www duma rent com ...
Page 14: ...www duma rent com ...
Page 15: ...1 Foreword www duma rent com ...
Page 38: ...1 Foreword Environmental considerations 24 56338011803 EN 02 2019 09 www duma rent com ...
Page 39: ...2 Safety www duma rent com ...
Page 71: ...3 Overviews www duma rent com ...
Page 73: ...Overviews 3 General view 56338011803 EN 02 2019 09 59 www duma rent com ...
Page 87: ...4 Operation www duma rent com ...
Page 384: ...4 Operation Decommissioning 370 56338011803 EN 02 2019 09 www duma rent com ...
Page 385: ...5 Maintenance www duma rent com ...
Page 392: ...5 Maintenance General maintenance information 378 56338011803 EN 02 2019 09 www duma rent com ...
Page 396: ...5 Maintenance General maintenance information 382 56338011803 EN 02 2019 09 www duma rent com ...
Page 433: ...6 Technical data www duma rent com ...
Page 458: ...6 Technical data Fuse assignment 444 56338011803 EN 02 2019 09 www duma rent com ...
Page 469: ...www duma rent com ...
Page 470: ...STILL GmbH 56338011803 EN 02 2019 09 www duma rent com ...