Operation
4
Replacing and transporting the battery
– Position the change frame (3) under the
battery (2) so that the centre of the battery
(1) is in line with the recess (4) in the change
frame.
This alignment ensures that the battery is
positioned centrally on the change frame. The
battery must be positioned centrally on the
change frame in order for the change frame to
be moved into the truck and to reduce the risk
of the battery tipping over when being moved.
If multiple batteries are used, it is advisable to
permanently mark the centre of the battery (1)
(e.g. using a strip of adhesive tape).
Picking up the battery
CAUTION
Risk of component damage!
– Move the change frame under the battery only
up to the edge of the stop.
6321_003-086
2
– Fold the battery safety catches (2) to the
side.
– Carefully move the change frame under the
battery.
– Carefully lift the battery up and out of the
truck. Pay attention to the distance to the
chassis.
WARNING
Risk of crushing/shearing!
The battery must be transported very carefully, i.e.
at a low speed, using slow steering movements and
careful braking.
– Do not use the methods described above to
transport the battery over long distances.
– Carefully remove the battery from the truck.
56338011803 EN - 02/2019 - 09
343
www.
duma
-rent.com
Summary of Contents for RX60-25
Page 2: ...www duma rent com ...
Page 4: ...www duma rent com ...
Page 14: ...www duma rent com ...
Page 15: ...1 Foreword www duma rent com ...
Page 38: ...1 Foreword Environmental considerations 24 56338011803 EN 02 2019 09 www duma rent com ...
Page 39: ...2 Safety www duma rent com ...
Page 71: ...3 Overviews www duma rent com ...
Page 73: ...Overviews 3 General view 56338011803 EN 02 2019 09 59 www duma rent com ...
Page 87: ...4 Operation www duma rent com ...
Page 384: ...4 Operation Decommissioning 370 56338011803 EN 02 2019 09 www duma rent com ...
Page 385: ...5 Maintenance www duma rent com ...
Page 392: ...5 Maintenance General maintenance information 378 56338011803 EN 02 2019 09 www duma rent com ...
Page 396: ...5 Maintenance General maintenance information 382 56338011803 EN 02 2019 09 www duma rent com ...
Page 433: ...6 Technical data www duma rent com ...
Page 458: ...6 Technical data Fuse assignment 444 56338011803 EN 02 2019 09 www duma rent com ...
Page 469: ...www duma rent com ...
Page 470: ...STILL GmbH 56338011803 EN 02 2019 09 www duma rent com ...