Commissioning
10.3 Commissioning the ET 200SP on PROFIBUS DP
Distributed I/O system
System Manual, 12/2016, A5E03576849-AG
205
Commissioning procedure
To commission the ET 200SP distributed I/O system as a DP master on PROFIBUS DP, we
recommend the following procedure:
Table 10- 4 Procedure for commissioning the ET 200SP as a DP master on the PROFIBUS DP
Step
Procedure
See ...
1
Installing ET 200SP (with CPU and CM DP)
Section Installation (Page 54)
2
Connecting ET 200SP
•
Supply voltages
•
PROFIBUS DP
•
Sensors and actuators
3
Inserting a SIMATIC memory card in the DP
master (CPU)
SIMATIC memory card on the CPU
(Page 209)
4
Configuring DP master (including PROFIBUS
address)
CPU 15xxSP-1 PN
http://support.automation.siemens
) and CM DP manual
5
Switching on supply voltages for DP master
CPU 15xxSP-1 PN
http://support.automation.siemens
) manual
6
Switching on supply voltages for DP slaves
Documentation of the DP slave
7
Download configuration to the DP master
STEP 7 online help
8
Switching DP master to RUN
CPU 15xxSP-1 PN
http://support.automation.siemens
) manual
9
Checking LEDs
CPU 15xxSP-1 PN
http://support.automation.siemens
) manual
10
Testing inputs and outputs
The following functions are helpful:
Monitoring and modifying tags,
testing with program status, forc-
ing, controlling the outputs. See
section Test functions and elimi-
nating problems (Page 259)
Summary of Contents for Simantic ET200SP
Page 1: ......