Commissioning
10.2 Commissioning the ET 200SP for PROFINET IO
Distributed I/O system
200
System Manual, 12/2016, A5E03576849-AG
Commissioning procedure
To commission the ET 200SP distributed I/O system CPU as an IO controller for
PROFINET IO, we recommend the following procedure:
Table 10- 1 Procedure for commissioning the ET 200SP CPU as an IO controller for PROFINET IO
Step
Procedure
See ...
1
Installing ET 200SP
Section Installation (Page 54)
2
Connecting ET 200SP
•
Supply voltages
•
PROFINET IO
•
Sensors and actuators
3
Inserting a SIMATIC memory card in the IO con-
troller
SIMATIC memory card on the CPU
(Page 209)
4
Configuring the IO controller
1
Section Configuring (Page 140)
5
Switching on supply voltages for the IO controller CPU 15xxSP-1 PN
http://support.automation.siemens
) manual
6
Switching on supply voltages for IO devices
Documentation of the IO device
7
Downloading the configuration to the IO controller STEP 7 online help
8
Switching IO controller to RUN mode
CPU 15xxSP-1 PN
http://support.automation.siemens
) manual
9
Checking LEDs
CPU 15xxSP-1 PN
http://support.automation.siemens
) manual
10
Testing inputs and outputs
The following functions are helpful:
Monitoring and modifying tags,
testing with program status, forc-
ing, controlling the outputs. See
section Test functions and elimi-
1
The IO devices are configured with the IO controller.
Summary of Contents for Simantic ET200SP
Page 1: ......