88
Assembly and Operating Instructions – Gear Units R..7, F..7, K..7, K..9, S..7, SPIROPLAN® W
6
Inspection/maintenance for the AL / AM / AQ. / EWH adapter
Inspection/Maintenance
6.4
Inspection/maintenance for the AL / AM / AQ. / EWH adapter
The following table lists the obligatory intervals and the corresponding measures:
6.5
Inspection/maintenance for the AD input shaft assembly
The following table lists the obligatory intervals and the corresponding measures:
Time interval
What to do?
•
Every 3 000 hours of operation, at least every
6 months
•
Check running noise for possible bearing
damage
•
Visually check the adapter for leakage
•
After 10 000 hours of operation
•
Check torsional play
•
Visually check the elastic annular gear
•
After 25 000 - 30 000 hours of operation
•
Renew the rolling bearing grease
•
Replace oil seal (do not install it in the
same track)
•
Change the elastic annular gear
Time interval
What to do?
•
Every 3 000 hours of operation, at least every
6 months
•
Check running noise for possible bearing
damage
•
Visually check the adapter for leakage
•
After 25 000 - 30 000 hours of operation
•
Renew the rolling bearing grease
•
Replace the oil seal
Page 100
Summary of Contents for BN 5-12 Series
Page 13: ...TAB 1 DEVICE DATA SHEETS ...
Page 18: ...TAB 2 APPROVED SUBMITTAL ...
Page 23: ...All data subject to change without notice 1 800 ASK 4WEG www weg net 14 ...
Page 26: ...Your advantages our pumps ...
Page 45: ...ADV 2 13E And what can we get flowing for you Your nearest contact Or visit www seepex com ...
Page 117: ...TAB 3 INSTALLATION OPERATIONS AND MAINTENANCE ...
Page 133: ...Page 37 ...
Page 233: ...www weg net Manual of Electric Motors 64 ENGLISH Figure 2 1 IEC motor nameplate Page 135 ...
Page 234: ...www weg net Manual of Electric Motors 65 ENGLISH Figure 2 2 NEMA motor nameplate Page 136 ...
Page 306: ...TAB 4 AS BUILTS AND SUPPLEMENTAL INFORMATION ...
Page 307: ...R Page 29 ...
Page 308: ...R Page 30 ...