Installation Checklist
SEEPEX
, Inc.
511 Speedway Dr.
Enon, OH 45323
Phone (937) 864-7150
Fax (937) 864-7157
www.seepex.com
Customer
Project Name
Customer PO No.
Pump Tag No.’s
SEEPEX Commission No.
SEEPEX Order No.
Pump Type Code
Note: The following needs to be completed, signed, and returned to above location prior to
START-UP.
Installation Checklist – Complete prior to start-up
No. Description
Completed
by
Date
1
Pumps, motors, and bases have been installed per instructions
and secured to the pump foundation.
2
Pumps and motors are aligned if separated during installation.
3
All piping connections are completely tightened.
4
All piping, valves, and gauges relating to the pumps are
installed correctly and securely anchored.
5
The suction and discharge lines are ready for operation.
6
All seal flush and drain connections are complete.
7
Gearboxes/motors have been checked for proper lubrication
and supplied breathers installed.
8
Suction lines have been flushed and clear of all foreign objects.
9
Pumps have been bumped (motors jogged) to verify proper
rotation.
10
Optional equipment needed for proper operation of pumps to
ensure they are functioning properly (i.e. – control panels,
pressure switches, dry run protection, etc.).
11
The power supply to the pump and controls has been
completed and is the correct voltage.
12
Fluid is available. The pumps can be operated sufficiently to
complete the test.
13
All safety guards and shields are in place.
14
If a piping pressure test is required, check pump accessories
for compatibility. Remove if necessary.
All parts are covered against defects in material and workmanship per SEEPEX, Inc.‘s warranty. See O&M for specific
details. The below date signifies data of installation.
_________________________________/______________________________________/__________________
Name
Contractor’s
Company
Name
Date
_________________________________/______________________________________/__________________
Name
Name
of
Owner’s
Organization
Date
_________________________________/______________________________________/__________________
Name
SEEPEX, Inc. or SEEPEX, Inc.‘s Representative
Date
Page 213
Summary of Contents for BN 5-12 Series
Page 13: ...TAB 1 DEVICE DATA SHEETS ...
Page 18: ...TAB 2 APPROVED SUBMITTAL ...
Page 23: ...All data subject to change without notice 1 800 ASK 4WEG www weg net 14 ...
Page 26: ...Your advantages our pumps ...
Page 45: ...ADV 2 13E And what can we get flowing for you Your nearest contact Or visit www seepex com ...
Page 117: ...TAB 3 INSTALLATION OPERATIONS AND MAINTENANCE ...
Page 133: ...Page 37 ...
Page 233: ...www weg net Manual of Electric Motors 64 ENGLISH Figure 2 1 IEC motor nameplate Page 135 ...
Page 234: ...www weg net Manual of Electric Motors 65 ENGLISH Figure 2 2 NEMA motor nameplate Page 136 ...
Page 306: ...TAB 4 AS BUILTS AND SUPPLEMENTAL INFORMATION ...
Page 307: ...R Page 29 ...
Page 308: ...R Page 30 ...