80
Assembly and Operating Instructions – Gear Units R..7, F..7, K..7, K..9, S..7, SPIROPLAN® W
5
Startup
5
Startup
• Before startup, check that the oil level is correct. Refer to the unit's nameplate for lu-
bricant fill quantities.
• The oil checking and drain screws and the breather valves must be freely accessible.
• The most important technical data is provided on the nameplate. Additional data rel-
evant for operation is available in drawings and the order confirmation.
• Ensure that all retaining screws are tight after the gear unit has been installed.
• Make sure that the orientation has not changed after tightening the mounting ele-
ments.
• Prior to startup, ensure that rotating shafts as well as couplings are equipped with
suitable protective covers.
• If an oil sight glass is used for checking the oil level, ensure that it is protected against
damage.
• It is essential that there is no open fire or risk of sparks when working on the gear unit.
• Protect the gear unit from falling objects.
• Remove transport fixtures prior to startup.
• Adhere to the safety notes in the individual chapters.
CAUTION
Improper startup may result in damage to the gear unit.
Possible damage to property.
• Note the following:
0
0
I
Page 93
Summary of Contents for BN 5-12 Series
Page 13: ...TAB 1 DEVICE DATA SHEETS ...
Page 18: ...TAB 2 APPROVED SUBMITTAL ...
Page 23: ...All data subject to change without notice 1 800 ASK 4WEG www weg net 14 ...
Page 26: ...Your advantages our pumps ...
Page 45: ...ADV 2 13E And what can we get flowing for you Your nearest contact Or visit www seepex com ...
Page 117: ...TAB 3 INSTALLATION OPERATIONS AND MAINTENANCE ...
Page 133: ...Page 37 ...
Page 233: ...www weg net Manual of Electric Motors 64 ENGLISH Figure 2 1 IEC motor nameplate Page 135 ...
Page 234: ...www weg net Manual of Electric Motors 65 ENGLISH Figure 2 2 NEMA motor nameplate Page 136 ...
Page 306: ...TAB 4 AS BUILTS AND SUPPLEMENTAL INFORMATION ...
Page 307: ...R Page 29 ...
Page 308: ...R Page 30 ...