18
Assembly and Operating Instructions – Gear Units R..7, F..7, K..7, K..9, S..7, SPIROPLAN® W
4
Required tools/resources
Mechanical Installation
4
Mechanical Installation
4.1
Required tools/resources
• Set of wrenches
• If necessary, torque wrench for:
– Shrink disks
– Motor adapter AQH Or EWH
– Input shaft assembly with centering shoulder
• Mounting device
• Compensation elements (shims, spacing rings)
• Fasteners for input and output elements
• Lubricant (e.g. NOCO
®
Fluid)
• Bolt locking compound (for input shaft assembly with centering shoulder), e.g.
Loctite
®
243
Standard parts are not included in the delivery
4.1.1 Installation tolerances
Shaft end
Flanges
Diameter tolerance in accordance with DIN 748
•
ISO k6 for solid shafts with Ø
≤
50 mm
•
ISO m6 for solid shafts with Ø > 50 mm
•
ISO H7 for hollow shafts
•
Center bore in accordance with DIN 332, shape
DR
Centering shoulder tolerance to DIN 42948
•
ISO j6 for b1
≤
230 mm
•
ISO h6 with b1 > 230 mm
Page 60
Summary of Contents for BN 5-12 Series
Page 13: ...TAB 1 DEVICE DATA SHEETS ...
Page 18: ...TAB 2 APPROVED SUBMITTAL ...
Page 23: ...All data subject to change without notice 1 800 ASK 4WEG www weg net 14 ...
Page 26: ...Your advantages our pumps ...
Page 45: ...ADV 2 13E And what can we get flowing for you Your nearest contact Or visit www seepex com ...
Page 117: ...TAB 3 INSTALLATION OPERATIONS AND MAINTENANCE ...
Page 133: ...Page 37 ...
Page 233: ...www weg net Manual of Electric Motors 64 ENGLISH Figure 2 1 IEC motor nameplate Page 135 ...
Page 234: ...www weg net Manual of Electric Motors 65 ENGLISH Figure 2 2 NEMA motor nameplate Page 136 ...
Page 306: ...TAB 4 AS BUILTS AND SUPPLEMENTAL INFORMATION ...
Page 307: ...R Page 29 ...
Page 308: ...R Page 30 ...