13.11
Date Code 20060320
Instruction Manual
SEL-311C Relay
Testing and Troubleshooting
Relay Testing
Purpose:
Verify the relay self-test status.
Method:
Step 1. Press the front-panel
{STATUS}
pushbutton.
The message
STATUS: OK
should appear on the relay LCD
screen.
Step 2. Use the Up and Down arrow buttons to view the results of
specific relay self-tests.
Step 3. Press the front-panel
{EXIT}
button to exit the STATUS display.
Purpose:
Connect voltage and current sources to the relay.
Method:
Step 1. Turn relay power off.
Step 2. If three voltage sources and three current sources are available,
connect the sources to the relay as shown in
.
If three voltage sources and two current sources are available,
connect them as shown in
.
Step 3. Apply 67 volts per phase (line-to-neutral) in positive-sequence
rotation.
Step 4. Apply 2.0 amps per phase, in phase with the applied phase
voltages.
Purpose:
Verify correct voltage and current connections and levels.
Method:
Step 1. Turn relay power on.
Step 2. Press the front-panel
{METER}
pushbutton.
Step 3. Use the arrow keys to examine the METER data.
The relay displays the measurements of the voltages and
currents applied in the steps listed above in
Purpose: Connect
voltage and current sources to the relay
.
With applied voltages of 67 volts per phase and a potential
transformer ratio of 2000:1, the displayed line-to-neutral
voltages should be 134 kV.
With applied currents of 2.0 A per phase and a current
transformer ratio of 200:1, the displayed line-to-neutral
currents should be 400 A.
All line-to-line quantities should be balanced, differing from
the line-to-neutral measurements by a factor of 1.73.
Real power P should be approximately 160.1 MW; reactive
power Q should be approximately 0 MVAR.
If you inadvertently switched a pair of voltages or currents, the
MW reading should be approximately zero. It is important to
remember this when commissioning the relay using system
voltages and currents.
Summary of Contents for SEL-311C
Page 1: ...20060320 SEL 311C Relay Protection and Automation System Instruction Manual PM311C 01 NB ...
Page 22: ...This page intentionally left blank ...
Page 42: ...This page intentionally left blank ...
Page 68: ...This page intentionally left blank ...
Page 128: ...This page intentionally left blank ...
Page 294: ...This page intentionally left blank ...
Page 330: ...This page intentionally left blank ...
Page 402: ...This page intentionally left blank ...
Page 406: ...This page intentionally left blank ...
Page 454: ...This page intentionally left blank ...
Page 574: ...This page intentionally left blank ...
Page 592: ...This page intentionally left blank ...
Page 616: ...This page intentionally left blank ...
Page 648: ...This page intentionally left blank ...
Page 652: ...This page intentionally left blank ...
Page 678: ...This page intentionally left blank ...
Page 682: ...This page intentionally left blank ...
Page 722: ...This page intentionally left blank ...
Page 724: ...This page intentionally left blank ...