ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL
55
Align cam shaft "R" index mark on LH
cylinder head as shown.
Ensure Timing TDC locator tool is being
seated properly on RH Crankcase.
10 mm socket
with Tommy
bar / ratchet
Use special tool Cam TDC Alinging plate
on RH side of cylinder head. Ensure
properly seated on head surface v/s cam
shaft end timing index tilted grooves ref
photo.
ST-30260/A
Cam TDC
Aligning Plate
13. RH side rocker carrier assembly
Remove diagonally RH rocker carrier
mounting flange nuts qty. 4 nos.
Lift RH side rocker carrier cover with
rocker arms & rocker shaft.
10 mm socket
with Tommy
bar / ratchet
Pull out rocker shaft by using M6 suitable
bolt by holding Inlet roller type rocker
arm.
Similarly remove exhaust rocker arm.
M6x1
threaded tool
/ bolt
Fastener, Size, Tool Usage, Precautions, Photos
Aggregate to Dismantle Instructions
R
Summary of Contents for CONTINENTAL GT 650 TWIN 2018
Page 1: ...650 TWIN SERVICE TRAINING MANUAL ...
Page 190: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 189 WIRING HARNESS ABS MODULATOR DOL Connector ...
Page 193: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 192 WIRING HARNESS SIGNALLING SYSTEM ...
Page 194: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 193 WIRING HARNESS ES STARTING SYSTEM ...
Page 195: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 194 WIRING HARNESS EFI SYSTEM IGNITION ...
Page 196: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 195 NOTES ...
Page 197: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 196 NOTES ...
Page 198: ......