ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL
54
Fastener, Size, Tool Usage, Precautions, Photos
11. LH side rocker carrier assembly
Remove diagonally rocker carrier
assembly mounting flange bolts qty.
4nos.
Lift LH side rocker carrier with rocker arms
& rocker shaft.
10MM socket
with Tommy
bar / ratchet
Pull out rocker shaft by using M6 suitable
bolt by holding inlet roller type rocker
arm.
Similarly remove exhaust V-type rocker
arm.
M6x1
threaded
tool / bolt
17MM socket
with tommy
bar
12. RH side valve timing,
Compression stroke
Rotate crankshaft slowly from LH cover
side to get compression stroke on RH
cylinder side.
Simultaneously insert special T tool from
RH side as shown in photo.
Special tool
TDC Locator
Aggregate to Dismantle Instructions
Summary of Contents for CONTINENTAL GT 650 TWIN 2018
Page 1: ...650 TWIN SERVICE TRAINING MANUAL ...
Page 190: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 189 WIRING HARNESS ABS MODULATOR DOL Connector ...
Page 193: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 192 WIRING HARNESS SIGNALLING SYSTEM ...
Page 194: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 193 WIRING HARNESS ES STARTING SYSTEM ...
Page 195: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 194 WIRING HARNESS EFI SYSTEM IGNITION ...
Page 196: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 195 NOTES ...
Page 197: ...ROYAL ENFIELD 650 TWIN SERVICE TRAINING MANUAL 196 NOTES ...
Page 198: ......