Page 84
The
third parameter
for each relay determines the
assignment
or
condition
of the relay, where required.
When P211, 221, 231, 241, 251 = 2 (Step Time)
If the relay is selected for Step Time
,
then this parameter is used to assign
the relay to the 0 =
Open
condition (increase level) or 1 =
Clos
e condition
(decrease level).
The
fourth parameter
,
fifth parameter
and
sixth parameter
are set to
determine the switch points, “
ON
” and “
OFF
” for the relay and where
required the order of start. See
control function
, table (
P211, 221, 231
) for
further information.
When P211, 221, 231, 241, 251 =1 (Time)
P213, P223, P233, P243, P253 Relay Setpoint 1
This parameter determines the “
Time Period
” that the relay will remain “
ON
”.
Relay Setpoints are entered in Minutes.
See the appropriate relay
Function
tables (
P211
,
221
,
231
,
241
,
251
) for further
information.
P214, P224, P234, P244, P254 Relay Setpoint 2
This parameter determines the “
Cycle Time
” for the operation of the relay.
See the appropriate relay
Function
tables (
P211
,
221
,
231
,
241
,
251
) for further
information.
When P211, 221, 231, 241, 251 = 2 (Step Time)
P213, P223, P233, P243, P253 Relay Setpoint 1
Relay Setpoint 1 is entered in values of
Measurement Units
(
P104
)
See the appropriate relay function tables (
P211
,
221
,
231
,
241
,
251
) for further
information.
P214, P224, P234, P244, P254 Relay Setpoint 2
Relay Setpoints are entered in Seconds to set
Drive Period
, the time that the
relay will remain ON
See the appropriate relay
Function
tables (
P211
,
221
,
231
,
241
,
251
) for further
information.
Summary of Contents for FlowCERT LITE
Page 1: ...FlowCERT LITE UL INSTRUCTION MANUAL...
Page 2: ......
Page 4: ......
Page 8: ......
Page 14: ...Page 6 EC DECLARATION OF CONFORMITY...
Page 18: ...Page 10 The full dimensions of the enclosure are as shown below...
Page 37: ...Page 29 This page left blank intentionally...
Page 77: ...Page 69...
Page 135: ...Page 127 This page left blank intentionally...