END WITH 2 HOLES
SWING BEAM WITH IRON DUCTILE SWING HANGERS ATTACHED
SWING BEAM SIDE OF FORT
STEP 60: REST SWING BEAM ON FORT
1: REST THE SWING BEAM ASSEMBLY ON TOP OF THE UPPER RAILING BOARDS OF THE FORT.
2: THE END OF THE SWING BEAM WITH 2 HOLES SHOULD OVERHANG THE SWING BEAM SIDE OF
THE FORT. IN THE NEXT STEP YOU WILL ATTACH THE SWING BEAM LEGS ONTO THIS END OF THE
SWING BEAM.
123
Summary of Contents for Everest Extreme 1500MW
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Page 217: ...APPENDIX 207...