STEP 62: MOUNT SWING BEAM TO FORT
1: PLACE A 3/8" X 9" CARRIAGE BOLT THROUGH A TORQUE WASHER. INSERT THE CARRIAGE
BOLT INTO THE HOLE AT THE END OF THE SWING BEAM OVER THE SWING BEAM MOUNT. ALIGN
THE SQUARE SHANK OF THE CARRIAGE BOLT WITH THE SQUARE HOLE IN THE TORQUE WASHER.
HAMMER THE CARRIAGE BOLT TO SET THE TORQUE WASHER INTO THE SWING BEAM.
2: ON THE BOTTOM SIDE OF THE SWING BEAM MOUNT ATTACH A 3/8" FLAT WASHER AND A 3/8"
LOCK NUT ONTO THE END OF THE CARRIAGE BOLT. PLACE A BOLT CAP OVER ANY EXPOSED
THREADS.
3: CENTER THE HOLE IN THE SWING BEAM PLATE ON THE SWING BEAM. PREDRILL A HOLE FOR
THE LAG SCREW. INSTALL A 3/8" X 3-1/2" LAG SCREW WITH 3/8" WASHER INTO THE HOLE IN THE
SWING BEAM PLATE.
A
3/8" LOCK NUT
DETAIL A
3/8"" X 9" CARRIAGE BOLT
TORQUE WASHER
3/8" WASHER
3/8" X 3-1/2" LAG SCREW
3/8" WASHER
BOLT CAP
125
Summary of Contents for Everest Extreme 1500MW
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Page 217: ...APPENDIX 207...