UPPER LEVEL
5/16" WASHER
5/16" X 4-1/2"
HEX BOLT
5/16" X 4-1/2"
5/16" WASHER
(3 HOLES ON CENTER)
RAILING BOARD
UPPER LEVEL STEPS/
2 X 4 X 70"
SUPPORT
3/8" X 5" LAG SCREW
3/8" WASHER
UNDER DECK
HEX BOLT
4 X 4 X 70"
2 X 6 X 70"
SANDBOX BOARD
(OFFSET UP)
STEP 37: UPPER LEVEL - RAILING & UNDER DECK SUPPORT
1: PLACE THE 2 X 4 X 70" UPPER LEVEL STEPS/RAILING BOARD (3 HOLES ON CENTER) AT THE TOP
OF THE REAR CORNER POSTS. THIS BOARD WILL GET ATTACHED TO THE 2ND HOLE DOWN FROM
THE TOP OF THE POSTS. THE T-NUT FOR THIS BOARD SHOULD BE ON THE INSIDE OF EACH POST
ALREADY. FASTEN THE UPPER LEVEL RAILING BOARD TO THE REAR CORNER POSTS WITH 5/16" X
4-1/2" HEX BOLTS AND 5/16" WASHERS.
2: PLACE THE 2 X 6 X 70" SANDBOX BOARD (OFFSET UP) AT THE BOTTOM OF THE REAR CORNER
POSTS. FASTEN THE TOP HOLES IN THE SANDBOX BOARD TO THE REAR CORNER POSTS WITH
5/16" X 4-1/2" HEX BOLTS AND 5/16" WASHERS.
3: PLACE THE 4 X 4 X 70" UPPER LEVEL UNDER DECK SUPPORT DIRECTLY UNDERNEATH THE
UPPER LEVEL DECK SUPPORTS. ATTACH THE UNDER DECK SUPPORT TO THE REAR CORNER
POSTS WITH 3/8" X 5" LAG SCREWS AND 3/8" WASHERS.
100
Summary of Contents for Everest Extreme 1500MW
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Page 217: ...APPENDIX 207...