A
PANEL BOARD
REAR BOTTOM
2 X 6 X 42-1/2"
2 X 6 X 30-7/16"
SIDE BOTTOM
PANEL BOARD
B
STEP 52: UPPER LEVEL BOTTOM PANEL BOARDS
LAG SCREWS AND
5/16" WASHERS
WITH 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS.
PANEL BOARD INSTALLED IN SUBSTEP 1. FASTEN THE REAR BOTTOM PANEL BOARD TO THE POSTS
OF THE UPPER LEVEL. MAKE THE TOP OF THE BOARD EVEN WITH THE TOP OF THE SIDE BOTTOM
5/16" WASHERS
HEX BOLTS AND
5/16" X 4-1/2"
1: PLACE THE 2 X 6 X 30-7/16" SIDE BOTTOM PANEL BOARD (OFFSET UP) ON THE SWING BEAM
SIDE (RIGHT SIDE) OF THE PLAYSET. ATTACH THE TOP HOLES OF THE BOARD TO THE POSTS WITH
5/16" X 4-1/2" HEX BOLTS AND 5/16" WASHERS. ATTACH THE BOTTOM HOLES WITH 5/16" X 3-1/2"
LAG SCREWS AND 5/16" WASHERS.
2: PLACE THE 2 X 6 X 42-1/2" REAR BOTTOM PANEL BOARD (OFFSET DOWN) ON THE BACK SIDE
5/16" X 3-1/2"
DETAIL A
SCALE 1 : 7
AND 5/16" WASHERS
LAG SCREWS
DETAIL B
SCALE 1 : 7
5/16" X 3-1/2"
115
Summary of Contents for Everest Extreme 1500MW
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Page 217: ...APPENDIX 207...