STEP 22: DRILLING CORNER POST HOLES
1: CHECK THE DIMENSION OF THE ROOF SUPPORT ASSEMBLIES AS SHOWN BELOW BEFORE
DRILLING HOLES.
2: MEASURE AS SHOWN BELOW AND MAKE MARKS ON THE CORNER POSTS ON THE INSIDE.
3: DRILL A 9/64" HOLE BY 2-1/2" DEEP AT EACH MARK.
4: REPEAT SUB STEPS 2-3 ON THE INSIDE OF THE OTHER POSTS AS POINTED OUT BELOW.
PROCESS ON THE INSIDE
OF THESE CORNER POSTS.
REPEAT THE
MEASURING/MARK/DRILL
1"
33-3/8"
1-7/8"
33 7
16 "
200
Summary of Contents for Everest Extreme 1500MW
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Page 217: ...APPENDIX 207...