PIECES)
SCALE 1 : 3
DETAIL A
PREDRILL 7/64" PILOT HOLES X 1/2" DEEP
AT EACH HOLE LOCATION ON BOTH
SIDES OF THE PLASTIC SUNBURST.
INSTALL A #8 X 1/2" PAN HEAD SCREW
AT EACH HOLE LOCATION (6 SCREWS
INCLUDED WITH PLASTIC SUNBURST
#8 X 1/2" PAN HEAD SCREW
PLASTIC
DORMER
SUNBURST
PIECES
CLATTER BRIDGE
ROOF
A
1: LOCATE TWO OF THE PLASTIC DORMER SUNBURST PIECES AS SHOWN.
2: PLACE THE PIECES AGAINST THE UNDERSIDE OF THE CLATTER BRIDGE ROOF OVERHANG.
3: PREDRILL 7/64" PILOT HOLES BY 1/2" DEEP INTO THE ROOF SIDES AT EACH HOLE LOCATION
4: INSTALL A #8 X 1/2" PAN HEAD SCREWS IN EACH HOLE TO FASTEN THE PLASTIC SUNBURST TO
THE ROOF SIDES.
REPEAT SUBSTEPS 2 THROUGH 4 FOR THE PLASTIC SUNBURST ON THE OTHER SIDE OF THE ROOF.
STEP 27: PLASTIC SUNBURST
205
Summary of Contents for Everest Extreme 1500MW
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Page 217: ...APPENDIX 207...