1" TO 1-3/4"
SCALE 1 : 7
DETAIL A
QUICK LINK
NOTE: TO ACHIEVE THE CORRECT
GAP YOU MAY NOT BE
CONNECTING THE END LINK OF
EACH CHAIN. FOR EXAMPLE YOU
MAY HAVE TO CONNECT THE
SECOND, THIRD OR FORTH LINKS
TOGETHER.
NO EXCEPTIONS!!
TWO BOARDS
CHAIN MUST GO THROUGH
A
STEP 19: BRIDGE DECK/CHAIN INSTALLATION
1: LAY THE BRIDGE DECK/CHAINS ASSEMBLY BETWEEN THE PLAY SET AND THE TOWER WITH THE CHAINS FACING
THE GROUND. THREAD THE CHAIN ENDS IN THE BRIDGE DECK ASSEMBLY THROUGH THE HOLES IN THE BOTTOM
PANEL BOARD AND DECK SUPPORT BOARD ON THE TOWER.
2: THERE SHOULD BE AT LEAST A 1" TO 1-3/4" GAP BETWEEN THE BRIDGE DECK BOARD AND THE BOTTOM PANEL
BOARD ON THE TOWER. THIS MEANS THAT YOU WILL HAVE TO CONNECT THE ENDS OF THE CHAINS IN A MANNER
TO ACHIEVE THE CORRECT GAP. GO UNDERNEATH THE TOWER DECK AND USE A QUICK LINK TO ATTACH THE
CHAINS TOGETHER. IF YOU HAVE LOOSE ENDS OF THE CHAINS HANGING DOWN THREAD THEM THROUGH THE
QUICK LINK TO KEEP THEM UP AND OUT OF THE WAY.
197
Summary of Contents for Everest Extreme 1500MW
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Page 217: ...APPENDIX 207...