5/16" WASHER
5/16" X 3-1/2"
LAG SCREW
REAR TOP PANEL BOARD
2 X 4 X 70"
FLUSH TO CENTER POST
STEP 50: RAILING
1: PLACE THE 2 X 4 X 70" REAR TOP PANEL BOARD (RAILING) AGAINST THE MIDDLE POSTS, FLUSH
WITH THE TOP END OF THE CENTER POST.
2: THE TOP OF THE RAILING SHOULD BE 33" ABOVE THE DECK BOARDS.
3: ATTACH THE RAILING TO THE LAG POSTS AND UPPER LEVEL CENTER POST WITH 5/16" X 3-1/2"
LAG SCREWS WITH 5/16" WASHERS.
113
Summary of Contents for Everest Extreme 1500MW
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Page 217: ...APPENDIX 207...