STEP 14: BRIDGE RAILS TO PLAYSET
1: PLACE THE BRIDGE RAILS AGAINST THE GREEN CORNER POST AND CENTER CORNER POST ON THE
PLAY SET.
2: LEVEL EACH TOP BRIDGE RAIL AND ATTACH THEM TO THE CORNER POSTS WITH 5/16" X 3-1/2" LAG
SCREWS AND 5/16" WASHERS.
3: MAKE THE BOTTOM OF EACH LOWER BRIDGE RAIL 16" FROM THE TOP OF THE TOP BRIDGE RAIL.
4: ATTACH EACH LOWER BRIDGE RAIL TO THE CORNER POSTS WITH 5/16" X 3-1/2" LAG SCREWS AND
5/16" WASHERS.
5: ATTACH 5/4 X 3 X 28-1/4" PANEL SLAT TO ROPE LADDER SUPPORT AND FRONT FACE BOARD, NEXT TO
THE BRIDGE RAIL WITH 2" WOOD SCREWS.
2" WOOD SCREWS
PANEL SLAT WITH
5/4 X 3 X 28-1/4"
AND 5/16" WASHERS
TOP RAILS
BOTTOM RAILS
5/16" X 3-1/2" LAG SCREWS
ATTACH
ATTACH TOP AND LOWER
BRIDGE RAILS TO CORNER
POSTS ON EACH SIDE WITH
59"
192
Summary of Contents for Everest Extreme 1500MW
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Page 217: ...APPENDIX 207...