INSTALLATION AND LAGS
STEP 40: CENTER DECK SUPPORT ASSEMBLY
1: PLACE THE CENTER DECK SUPPORT ASSEMBLY ON TOP OF THE 4 X 4 X 70" UPPER LEVEL UNDER DECK SUPPORT.
THE 4 X 4 X 59-1/2" LOWER LEVEL CENTER POST SHOULD FIT INSIDE THE CENTER DECK SUPPORT ASSEMBLY.
2: MAKE THE CENTER DECK SUPPORT ASSEMBLY LEVEL WITH THE CENTER DECK SUPPORTS. THE END OF THE CENTER
DECK SUPPORT ASSEMBLY SHOULD BE FLUSH TO THE SIDE OF THE LOWER LEVEL CENTER POST.
3: ATTACH THE CENTER DECK SUPPORT ASSEMBLY TO THE 4 X 4 X 59-1/2" LOWER LEVEL CENTER POST WITH
5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS.
4: CENTER THE CENTER DECK SUPPORT ASSEMBLY ON TOP OF THE 4 X 4 X 70" UPPER LEVEL UNDER DECK SUPPORT.
LEAVE AN EQUAL SPACE ON EACH SIDE OF THE CENTER DECK SUPPORT ASSEMBLY. THE END OF THE CENTER
DECK SUPPORT ASSEMBLY SHOULD BE FLUSH TO THE OUTSIDE OF THE REAR CORNER POSTS.
5: FASTEN THE CENTER DECK SUPPORT ASSEMBLY TO THE 4 X 4 X 70 UPPER LEVEL UNDER DECK SUPPORT
WITH A 3/8" X 5" LAG SCREW AND A 3/8" WASHER.
6: FASTEN THE BOTTOM HOLES OF THE SIDE SANDBOX BOARDS/REAR SANDBOX BOARD TO THE REAR CORNER
POSTS WITH 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS.
5/16" WASHER
5/16" X 3-1/2" LAG SCREW AND
SIDE SANDBOX BOARDS
AND REAR SANDBOX
BOARD LAGS.
FRONT FACE OF POST
ENDS FLUSH TO
WITH 3/8" WASHER
3/8" X 5" LAG SCREW
WITH 5/16" WASHER (BOTH SIDES)
5/16" X 3-1/2" LAG SCREW
CENTER DECK SUPPORT
ASSEMBLY
(CENTER IT BETWEEN THE
REAR CORNER POSTS.)
LEVEL WITH EACH OTHER
FLUSH
103
Summary of Contents for Everest Extreme 1500MW
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Page 217: ...APPENDIX 207...