FASTEN TO THE CORNER POSTS WITH 5/16" X 3-1/2" LAG SCREWS WITH 5/16" WASHERS.
1: PLACE THE 2 X 4 X 14" BOTTOM PANEL BOARD ON TOP OF THE 2 X 6 PANEL BOARD AND
STEP 9: BOTTOM PANEL BOARDS
2: PLACE THE 2 X 4 X 47-1/2" BOTTOM PANEL BOARD (HOLES OFFSET UP) ON TOP OF THE 2 X 6
PANEL BOARD AND FASTEN TO THE CORNER POSTS WITH 5/16" X 3-1/2" LAG SCREWS AND
5/16" WASHERS.
5/16" WASHER
ON CENTER
2 X 4 X 14"
BOTTOM PANEL BOARD
COUNTER-SUNK HOLES
5/16" X 3-1/2" LAG SCREW
FRO
NT
OF
FOR
T
5/16" X 3-1/2"
WASHER
5/16"
LAG SCREW
2 X 4 X 47-1/2"
BOTTOM PANEL BOARD.
(HOLES OFFSET UP)
FRONT O
F FORT
70
Summary of Contents for Everest Extreme 1500MW
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Page 217: ...APPENDIX 207...