
KENR6932
125
Disassembly and Assembly Section
g01340176
Illustration 249
4.
Inspect dowels (18) for damage. If necessary,
replace the dowels in the cylinder block.
5.
Install Tooling (A) to the cylinder block.
6.
Align cylinder head gasket (17) with dowels (18).
Install cylinder head gasket (17) onto the cylinder
block.
g01340086
Illustration 250
Typical example
7.
Use a suitable lifting device (16) to lift cylinder
head (15). The weight of the cylinder head is
approximately 66 kg (145.5 lb).
Note:
A spreader bar must be used in order to
distribute the weight of the cylinder head during the
lifting operation.
8.
Use Tooling (A) to align the cylinder head with
the cylinder block. Install the cylinder head to the
cylinder block.
Note:
Ensure that the cylinder head is correctly
positioned on dowels (18).
9.
Remove Tooling (A).
g01340188
Illustration 251
10.
Clean bolts (14). Follow Steps 10.a for the
procedure to inspect the bolts.
a.
Use a straight edge to check the threads of the
bolts. Refer to Illustration 251. Replace any
bolts that show visual reduction in the diameter
of the thread over length (Y).
11.
Lubricate the threads and the shoulder of bolts
(14) with clean engine oil.
g01340081
Illustration 252