
A
Troubleshooting
A-71
2.3 Troubleshooting checkpoints
2.3.1
Installation and power supply
Symptom
Possible cause
Check items
Corrective action
1
The controller was not
turned on even though
the power was supplied.
• Power is not supplied.
• Problem occurred in the
controller internal power
supply.
• Check power input terminal
connection (L/N/L1/N1).
• Check power input terminal
voltage (L/N/L1/N1).
• Check if "PWR" LED on front
panel is lit.
• Connect the power input
terminal correctly.
• Supply the specified power
voltage.
• Replace the controller.
2
The programming box is
not displayed even
though the controller is
turned on.
• The programming box is not
connected.
• The programming box
connection is incorrect.
• Malfunction occurred in the
programming box.
• Problem occurred in
controller internal power
supply.
• Check the PB connector.
• Check how the PB connector
is inserted.
• Replace the programming
box and check operation.
• Plug in the PB connector
correctly.
• Replace the programming
box.
• Replace the controller.
3
Although the controller
turns on, the alarm
number is displayed on
the 7-segment LED on
the front.
• The controller is now in
emergency stop status.
• Connect the programming box
and check the alarm using self-
diagnosis.
• Check the DO00 (Output of
emergency stop input status)
on the "MONITOR" screen
displayed on the programming
box.
• Release the emergency stop
button on the programming
box.
• Connect the PB connector.
• Connect the emergency stop
terminal of the SAFETY
connector.
• An alarm with alarm group
number 17 occurred.
• Connect the programming box
and check the alarm using self-
diagnosis.
• Check the axis from the
alarm information.
• Check the cause from the
alarm information.
• Take the corrective action.
• An alarm with alarm group
number 21 or 22 occurred.
• Connect the programming
box and check the alarm
using self-diagnosis.
• Check the cause from the
alarm information.
• Take the corrective action.
Summary of Contents for R6YXC1000
Page 1: ...7 6HULHV DW 1R 1 5 5RERW RQWUROOHU 86 5 6 0 18 6 5 5RERWV 5 6HULHV...
Page 2: ......
Page 10: ......
Page 40: ......
Page 42: ......
Page 46: ......
Page 48: ......
Page 54: ......
Page 56: ......
Page 64: ......
Page 80: ......
Page 82: ......
Page 102: ......
Page 108: ......
Page 110: ......
Page 136: ......
Page 168: ......
Page 170: ......
Page 174: ...8 Periodic inspection 8 4...
Page 176: ......
Page 182: ......
Page 256: ......
Page 258: ......
Page 259: ......
Page 260: ...DW 1R 1 XWKRUL HG LVWULEXWRU 3ULQWHG LQ XURSH...