![Omron NC1-510000 User Manual Download Page 121](http://html1.mh-extra.com/html/omron/nc1-510000/nc1-510000_user-manual_742744121.webp)
Equipotential Bonding System
Equipotential bonding is an earthing method in which steel frames and building structures, metal ducts
and pipes, and metal structures in floors are connected together and make connections to the earth
trunk line to achieve a uniform potential everywhere across the entire building. We recommend this
earthing method.
The following figure shows an example of an equipotential bonding system.
Connect the main earthing terminal and building structures together with equipotential bonding con-
ductors and embed the mesh ground line in each floor.
Connect the ground line of each control panel to the equipotential bonding system.
Information device
Power device
Metal duct and pipe
Building structure
Equipotential bonding conductor
Main earthing terminal
Earth electrode
Metal structure in floor
Earth trunk line
Control panel Control panel Control panel
Hub
Noise source
5 Installation
5-23
AMR Controller User's Guide (I650)
5-4
W
ire
5
5-4-2
Ground
Summary of Contents for NC1-510000
Page 1: ...AMR Controller User s Guide NC1 510000 NC1 510001 AMR Controller I650 E 01...
Page 4: ...Introduction 2 AMR Controller User s Guide I650...
Page 36: ...1 Overview 1 6 AMR Controller User s Guide I650...
Page 156: ...7 Maintenance 7 8 AMR Controller User s Guide I650...
Page 183: ...I Index I 1 AMR Controller User s Guide I650 I...
Page 186: ...Index I 4 AMR Controller User s Guide I650...
Page 187: ......