![NEC N8100-1078F User Manual Download Page 249](http://html1.mh-extra.com/html/nec/n8100-1078f/n8100-1078f_user-manual_4225291249.webp)
Upgrading Your Server 9-31
8.
Secure four screws to fix the heat sink.
NOTE:
Tighten four screws temporarily in the following order shown
in the figure below, and then completely tighten all screws.
9.
Make sure that the heat sink is level.
NOTES:
If the heat sink is not level, remove it, and then install it again. The
following probably causes the heat sink not to be level:
– The CPU is not positioned correctly.
– The wire clip is not engaged correctly.
Do not move the secured heat sink.
10.
Install the components you removed previously.
11.
Power on the server.
12.
Insert the NEC EXPRESSBUILDER CD-ROM into the CD-ROM drive and reboot the
system.
After rebooting the system, the NEC EXPRESSBUILDER menu appears on the screen.
13.
Click [End], and select [DOS].
14.
Enter as "cd SDR" against the prompt "Q:\>" and press
Enter
.
15.
Enter as "SDRUP" against the prompt "Q:\SDR>" and press
Enter
.
16.
Updating the configuration data is started.
If the following message is displayed on the way, press
Enter
to continue updating.
Password (Q to quit):
It takes about five to six minutes to complete updating.
Summary of Contents for N8100-1078F
Page 16: ...x This page is intentionally left blank...
Page 34: ...2 6 General Description Rear View 1 2 3 13 12 11 10 9 8 7 6 5 4...
Page 36: ...2 8 General Description Internal View 1 2 4 4 4 3 4 2 4 1 5 6 7 8 3...
Page 100: ...4 32 Configuring Your Server This page is intentionally left blank...
Page 150: ...5 50 Installing the Operating System with Express Setup This page is intentionally left blank...
Page 170: ...6 20 Installing and Using Utilities This page is intentionally left blank...
Page 182: ...7 12 Maintenance This page is intentionally left blank...
Page 257: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below...
Page 266: ...10 10 Internal Cabling Diagrams This page is intentionally left blank...
Page 268: ...A 2 Specifications This page is intentionally left blank...
Page 278: ...C 4 IRQ and I O Port Address This page is intentionally left blank...
Page 328: ...F 18 Installing Windows 2000 This page is intentionally left blank...