Procedure:
1.
Select [Dosing] and confirm.
The production window appears.
2.
Select material ID [ID 2].
3.
Press the [Start] softkey.
Press the [Stop] softkey to stop the process.
You can then press the [Restart] softkey to restart the process.
The material (product) is filled.
4. Once the set point is reached, the [Start] softkey can be pressed again.
5.
Press
2× to exit the application.
8 Production
Transmitter in field housing PR 5230
EN-227
Minebea Intec