Card test:
The device display shows the fieldbus card status.
Under
- [HW-Slots] - [Slot 2] all inputs and outputs are displayed.
Procedure:
Note:
Further details can be found in the supplementary application manual "How to
"
(available upon request from [email protected]).
Note:
See Chapter "Description of the I/O Area"
Example:
The gross weight should be read.
I/O size = 8 bytes, counted from byte 0–7
7.15.5.2
DeviceNet settings for Rockwell workstation
Requirements:
-
PR 1721/44 DeviceNet is installed.
-
The parameters are selected and saved.
Card test:
The device display shows the fieldbus card status.
Under
- [HW-Slots] - [Slot 2] all inputs and outputs are displayed.
Procedure:
Note:
Further details can be found in the supplementary application manual "How to
"
(available upon request from [email protected]).
1.
Establish communication with the PLC (here: SIEMENS S7-300/400 or S7-1500).
2.
Create/open a project in the "SIMATIC MANAGER."
3.
Load the file "sart5230.gsd" from CD and install it in the development environment.
4. Add the PR 5230 device to the project and assign the I/O ranges.
1.
Register the file "sag_5230.eds" using the "Hardware Installation Tool".
2.
Select and insert the instrument from the catalog into the I/O configuration.
7 Commissioning
Transmitter in field housing PR 5230
EN-191
Minebea Intec