215333
283
Revision A
1010967
A
B
C
D
Figure 4.333: Right of Carrier
–
Top View
14. On the right of the rotary disc pull-type, remove M20
nut (A), washers, and hex head bolt (B) securing carrier
leg (C) and float spring arm (D) to the header.
15. Move float spring arm (D) clear of conditioner.
1011437
A
B
C
Figure 4.334: Left of Conditioner
16. Remove M20 nut (A), washers, and hex head bolt (B)
securing carrier leg (C) to the left end of the header.
1030468
A
B
C
Figure 4.335: Mechanical Center-Link
17.
If equipped with mechanical center-link:
Remove clevis
pin (A) connecting center-link (B) to anchor (C), and
separate the center-link from the anchor. Reinstall the pin
in the anchor to store.
18.
If equipped with mechanical center-link:
Secure center-
link (B) to the carrier frame with a strap or wire to prevent
them from contacting the rotary disc pull-type during
separation.