
215794
161
Revision A
1029714
A
B
Figure 8.35: Header Float Linkage
3.
Check that the float engagement pin is installed in storage
position (B) and
NOT
in engaged position (A).
IMPORTANT:
To prevent damage to the lift system when lowering the
header lift linkages without a header or a weight box
attached to the windrower, ensure that the float
engagement pin is installed in storage position (B) and
NOT
in engaged position (A).
1008925
A
Figure 8.36: Ground Speed Lever
DANGER
Ensure that all bystanders have cleared the area.
4.
Start the engine and activate HEADER DOWN button (A) on
the ground speed lever (GSL) to fully retract the header lift
cylinders.
1008942
A
Figure 8.37: Ground Speed Lever
5.
Press REEL UP switch (A) on the GSL to raise the center-link
until the hook is above the attachment pin on the header.
IMPORTANT:
If the center-link is too low, it may contact the header as
the windrower approaches the header for hookup.