![LOAD KING 80-160 Operator'S Manual Download Page 62](http://html1.mh-extra.com/html/load-king/80-160/80-160_operators-manual_1932350062.webp)
62
80-160
Safety
Ending Crane Operations
Prior to leaving the crane, the operator must be certain the crane is in a condition acceptable to be left
unattended.
End of Operations checklist
1. _________
Is the load fully on the ground and unhooked from the crane?
2. _________
Is telescopic boom all the way in?
3. _________
Is work-site crane boom all the way down and disassembled if necessary?
4. _________
Is parking brake on crane chassis set?
5. _________
Is crane engine off and ignition key removed?
6. _________
Is the crane cab locked?
7. _________
Is the crane secured from unauthorized use?
8. _________
Is the vehicle cab unoccupied?
9. _________
Is the vehicle engine off and the key removed?
10._________
Is the vehicle parking brake set?
11._________
All controls in neutral?
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...