![LOAD KING 80-160 Operator'S Manual Download Page 193](http://html1.mh-extra.com/html/load-king/80-160/80-160_operators-manual_1932350193.webp)
193
Roading the Unit
Before leaving the work site or repositioning the crane at the work site, always:
1. Retract boom. Stow boom on the boom rest. Always use the boom rest.
2. Using D-Ring on rear of truck, attach load line hook and hoist in until slack is taken up. On tractor
mount models, always use boom rest for securing the boom and tie off load line hook to attachment
provided
NEVER LEAVE BOOM ELEVATED OR LOAD SUSPENDED WHEN UNIT IS
UNATTENDED.
3. Fully retract all outriggers.
4. Disengage Power Take Off (PTO).
THE
LOAD KING
BOOM TRUCK IS NOT A PICK AND CARRY CRANE. NEVER
DRIVE TRUCK WITH BOOM EXTENDED OR ELEVATED, OR WITH A LOAD
SUSPENDED FROM LOAD LINE HOOK.
NEVER LEAVE THE WORK SITE OR REPOSITION THE TRUCK CRANE
WITHOUT FIRST SECURING THE BOOM IN ROAD TRAVEL POSITION AND
FULLY RETRACTING ALL OUTRIGGERS.
You should always know the maximum road height of your crane when repositioning at the job site or
preparing for road travel. A placard like the one shown above, which shows the height of your crane as
manufactured and installed is attached to the dash board inside the truck cab. Severe personal injury,
as well as damage to the crane and truck, can result from failure to observe overhead obstructions
during repositioning at the job site or during road travel.
ALWAYS KNOW YOUR MAXIMUM ROAD HEIGHT AND OBSERVE ALL
OVERHEAD OBSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SEVERE
DAMAGE TO THE CRANE/VEHICLE AND/OR DEATH OR SERIOUS INJURY TO
OPERATING PERSONNEL.
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...