131
Inspection
Pre-Start Inspection
The following items should be checked each day before start-up and the start of operations.
ENGINE OIL
The level should be at the full mark.
COOLANT
The level should be near the bottom of fill neck in coolant tank when cold.
DIESEL EXHAUST FLUID
Check diesel exhaust fluid (DEF) or Urea tank level is full. An illuminated Warning on dash or
Check Engine light will indicate a low level. (Tier 4 engine models only)
LEAKAGE
Make a ground check below the machine for signs of leaks. See Hydraulic Hose topic in Maintenance
section.
FUEL
Fuel for the engine and for upper unit heater should be adequate for sustained operations.
LUBRICATION
Perform the daily lubrication as required in the Lubrication Recommendations. Lubricate cylinder
mounting bushings, and pins.
LINES AND BLOCKS
Inspect the hoist lines, hoist block and ball hook, and the crane attachment in general for readiness.
SAFETY EQUIPMENT
Check the safety equipment, including all lights, brakes, and hazard warning devices.
TIRES
The tires should be checked for proper pressure before traveling the machine. The tires should only be
checked when cold. Refer to the Tire Pressure Chart in the operator’s cab.
WHEEL NUTS
Torque all lug nuts to carrier chassis supplier recommendations. Check tightness daily during the first
50 miles of service on new units and any time the wheels have been removed. Ensure proper alignment
of tire and rim assemblies.
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...