Operating Instructions
Emergency Procedures
Emergency Procedures
When operational aids are inoperative or malfunctioning, the following requirements shall apply for
limited (temporary) use or shutdown of the crane.
1. Steps shall be taken to schedule repairs and recalibration immediately. The operational aids shall
be put back into service as soon as replacement parts, if required, are available and the repairs and
recalibration can be carried out. Every reasonable effort must be made to expedite the repairs and
recalibration.
2. When a load indicator, rated capacity indicator, or rated capacity limiter is inoperative or
malfunctioning, the designated person responsible for supervising the lifting operations shall
establish procedures for determining load weights and shall ascertain that the weight of the load
does not exceed the crane ratings at the radius where the load is to be handled.
3. When a boom angle or radius indicator is inoperative or malfunctioning, the radius or boom angle
shall be determined by measurement.
4. When a ATB device, two-blocking damage prevention, or two-block warning device is inoperable
or malfunctioning, the machine must be shutdown until the device is corrected and the device must
be deemed in good working order. No over ride of the system is permissable by the operator. The
supervisor on the job site would be the only person to be allowed to OVER RIDE the system.
5. When a boom length indicator is inoperative or malfunctioning, the designated person responsible
for supervising the lifting operations shall establish the boom length at which the lift will be made
by actual measurement or marking on the boom.
6. When a level indicator is inoperative or malfunctioning, other means shall be used to levelthe crane
within the level requirements specified by the manufacturer.
In certain situations, It may be necessary to override the automatic motion limiter of the RCI / ATB unit
in order to safely operate the crane. These include, but are not limited to:
The load block may lift the ATB weight before the load line can be tensioned while stowing the boom.
This will cause a motion cutout. Overriding the system, in this situation is acceptable in order to continue
to winch in slack line, securing the boom.
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...