205
Emergency Rotation
The
80-160
is equipped with a spring applied, hydraulic released brake. If hydraulic pressure is not
available from the machine, a hand pump or other means of supplying
400 psi
must be provided to swing
the crane in emergency situations.
1. Make sure crane is on level surface and use emergency retraction procedures to fully retract the
boom.
2. Use emergency lowering procedures to lower the boom about 1 foot above the boom rest. Attach
a tag line to the boom.
3. To release the friction swing brake and allow the vertical self alignment of the boom end over the
load being lifted, press the rocker switch item (45) in the upper right side of console to unlock.
4. Switch the swing lock item (46) to “OFF” in operator’s cab.
5. Use another vehicle to connect with straps to hook block and apply side pull to rotate crane boom
into position over boom rack.
6. Actuate Swing Lock Switch to “ON”.
ONCE BOOM IS IN BOOM REST, USE STRAPS TO SECURE BOOM INTO BOOM
REST FOR ROADING. IF HOOK BLOCK OR LOAD BALL CANNOT BE SECURED
TO TIEDOWN POINT, REMOVE IT AND SECURE ANY LOOSE WINCH CABLES.
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...