![LOAD KING 80-160 Operator'S Manual Download Page 191](http://html1.mh-extra.com/html/load-king/80-160/80-160_operators-manual_1932350191.webp)
191
1.
Outrigger Beam Lock Pin
- shown in (locked) position, lift bolt, rotate pin clockwise until bolt
drops into slot lowest position which will prevent beam from extending. Never drive crane without
locking all (4) four pins.
2.
Outrigger Pad Storage
- Insert lockpin as shown above (1) one place on each pad and repeat this
procedure on (4) four outrigger pads.
- Stow the boom in the boom rack.
- Watch for overhead obstructions such as trees, power lines, or bridges.
- If the terrain is rough or uneven it may be necessary to travel at a reduced speed to prevent
instability or damage to the crane.
- Operating on steep grades requires caution because the oil in the engine or transmission will move
to one side of the engine or transmission. As a result, the engine or transmission may not be fully
lubricated which could damage the engine or transmission.
- The operator must be very careful on steep side slopes to avoid tipping the crane.
NOTE:
This machine can travel on 15° side slopes which have a firm level prepared surface. Due to
variations in the ground surface, tire pressure, bumps, potholes, etc., we recommend that travel on
side slopes be limited to 5° and that the boom be horizontal or below.
Crane Setup’s and Moving of Unit Restrictions - strict adherance to the below chart
must be followed or damage can result to front axles due to overloading or structural
damage to crane due to dynamics of jib in erected state.
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...