Description Of Machine and Controls
Anti-Two-Block Components
CABLE REEL
The ATB cable is wound onto a spring loaded cable reel which is bolted to the left side of the boom base.
The reel allows the cable to pay-out and pay-in as the length of the boom is changed. The cable reel has
slip rings which allow electric current to flow even while the reel is turning. This cable and reel assembly
is also used to measure boom extension when the Boom Truck is fitted with a RCI system.
LIMIT SWITCH
An ATB switch is mounted on the left side of the boom tip. The switch is normally open. During operation
the switch is held closed by a counterweight suspended from the switch lever by a chain. The closed
limit switch allows current to close the relay in the junction box in the mainframe. When the load block
(or downhaul weight) is lifted too high, it will lift the counterweight. This action will cause the limit switch
to open, breaking the circuit to the relay. This, in turn, de-energizes the coil on the unloader block
assembly.
ATB Components
2 1
1
1
1
4
5
6
3
2
1 ATB Wire
4 ATB Switch
2 ATB Reel
5 ATB Chain
3 ATB (to collector ring)
6 ATB Weight
The Greer VGA ELEMENT is designed as an aid. Refer to Maximum Load chart for
proper areas of operation.
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...