![LOAD KING 80-160 Operator'S Manual Download Page 213](http://html1.mh-extra.com/html/load-king/80-160/80-160_operators-manual_1932350213.webp)
213
Transportation
Transporting the Crane
The boom must be stowed in the boom rack before transporting the crane.
Restrain the boom extend sections by snugging the hook block against the boom head, or secure the
boom head back to the base section of the boom with chains or cable when transporting the crane on
a semitrailer. An extended(ing) boom can cause substantial damage. The hydraulic system will not hold
the sections against the hard breaking jolts while the crane is being transported.
- Carry the boom over the front only.
- Lock the swing brake and swing lock.
- Secure the hook block or ball to the bumper loop or raise the hook block or ball close to the boom
head sheaves before moving.
The outrigger pins need insertion to retain beams in retracted position.
- Make sure all (4) four outriggers are completely swung inboard and beams retracted and locked
per instruction on item 1, before moving the crane.
1
1.
Outrigger Beam Lock Pin
- shown in (locked) position, lift bolt, rotate pin clockwise until bolt
drops into slot lowest position which will prevent beam from extending. Never drive crane without
locking all (4) four pins.
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...