![LOAD KING 80-160 Operator'S Manual Download Page 192](http://html1.mh-extra.com/html/load-king/80-160/80-160_operators-manual_1932350192.webp)
192
80-160
Operating Instructions
Travel Setup- Jib Extended w / hook ball rigged (Figure 1)
Travel Setup- Jib Extended w / hook ball & hook block rigged (Figure 2)
SETUP CWT “OFF
/ “ON”
JIB
LOCATION
BOOM
LOCATION
SWING
LOCK-
OFF / ON
TRAVELING
YES / NO
SPEED
RESTRI-
CTION
Setup #1 CWT “ON”
Jib Stowed
Boom
Retracted &
in Boom
Rack
Swing
Lock- ON
YES
<2 MPH
Setup #2 CWT “ON”
- Min. total to
prevent axle
overload-
2000# SLAB
Jib Erected
& Stinger
Rretracted
Boom
Retracted &
in Boom
Rack
Swing
Lock- ON
YES
<2 MPH
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...