Lifting the Load
Follow recommended procedures for work site position, outrigger positioning, and control metering.
Always inspect downhaul weight, load line, hook and/ or any load handling equipment for damage or
excessive wear before use.
The following general instructions should be adhered to each time a lifting operation is performed.
IT IS IMPORTANT THAT YOU KNOW THE WEIGHT OF ANY MATERIAL THAT
YOU ATTEMPT TO HANDLE. THIS CAN BE DETERMINED BY USE OF A
DYNAMOMETER OR SCALES.
STEPS TO LIFTING A LOAD
1. Determine what the total load weighs.
NOTE:
Total load includes the weight of the material being lifted plus any material handling devices
such as slings, yokes, personnel platforms, load blocks, jib deducts, etc.
2. Consult the maximum load chart on your crane and determine the correct boom radius and parts
of line required based upon your load weight using VGA ELEMENT RCI system.
3. Check the configuration setting number for the VGA
ELEMENT RCI
- It must match the actual crane
configuration (Including parts of line rigged).
4. Attach load line to material and begin operation. Observe proper sling or chain usage and make
sure any load handling attachment used has adequate size and capacity for the load being lifted.
THE RATED CAPACITY INDICATOR SYSTEM DOES NOT PROTECT THE
CRANE WHEN THE BOOM IS OPERATED BELOW HORIZONTAL.
Observe position of boom and load at all times. The rated capacity indicator system does not
protect against shock loads or side loading.
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...